On December the 14th, M-NAV signed a contract with the Italian manufacturer “LEONARDO” for procurement and installation of the new Air Traffic Management System in M-NAV.  The contract includes a new technical – operational room suitable to accommodate the System.
The procurement process was conducted in accordance with EBRD Rules and Polices, hereby the entire process was monitored and approved by EBRD.

After signing the Contract, this extensive and demanding tendering procedure was successfully concluded. The most important “core” system for the provision of safe air navigation services is the ATM system.

With the new ATM system M-NAV will be able to provide services that meet the highest levels of safety standards and provide compliance with the latest technological standards. The new ATM system will enhance the capacities and increase the efficiency of the entire system at the same time. All these strengths the M-NAV’s capability to cope with the expected increase of the traffic demand in the future.

Signing contract with "Leonardo"

SIgning contract with "Leonardo"

SIgning contract with "Leonardo"